NYSE MKT: QMM Last: 0.18Change: 0.00 TSX-V: QTA Last: 0.16Change: 0.00 2013-05-24

 

Videos, Tables, Maps and Photos

Videos

Tables

TABLE 1
MACARTHUR COPPER PROJECT -YERINGTON, NEVADA
MEASURED AND INDICATED COPPER RESOURCES
May 2012

 

Cutoff Grade
%TCu

Tons
(x1000)

Average Grade
%TCu

Contained Copper
(lbs x 1000)

Oxide and Chalcocite Material 
(MinZone 10 and 20)

0.50

3,401

0.720

48,974

0.40

6,730

0.583

78,485

0.35

10,092

0.513

103,544

0.30

16,251

0.441

143,171

0.25

29,859

0.364

217,075

0.20

65,421

0.286

374,601

0.18

89,306

0.260

465,106

0.15

125,659

0.233

585,822

0.12

159,094

0.212

675,513

Primary Material 
(MinZone 30)

0.50

98

0.720

1,411

0.40

193

0.586

2,263

0.35

273

0.523

2,857

0.30

354

0.478

3,382

0.25

507

0.416

4,216

0.20

670

0.369

4,938

0.18

796

0.340

5,414

0.15

1,098

0.292

6,408

 

TABLE 2
MACARTHUR COPPER PROJECT -YERINGTON, NEVADA
INFERRED COPPER RESOURCES
May 2012

 

Cutoff Grade
%TCu

Tons
(x1000)

Average Grade
%TCu

Contained Copper
(lbs x 1000)

Oxide and Chalcocite Material 
(MinZone 10 and 20)

0.50

4,294

0.657

56,423

0.40

9,656

0.538

103,899

0.35

15,357

0.477

146,444

0.30

25,851

0.414

213,788

0.25

43,695

0.356

311,108

0.20

82,610

0.293

483,929

0.18

109,920

0.267

587,412

0.15

166,930

0.232

774,889

0.12

243,417

0.201

979,510

Primary Material 
(MinZone 30)

0.50

10,644

0.819

174,413

0.40

18,442

0.653

240,742

0.35

23,316

0.594

277,181

0.30

33,831

0.511

345,415

0.25

53,060

0.423

449,312

0.20

89,350

0.341

609,188

0.18

101,375

0.323

654,680

0.15

134,900

0.283

764,074

Maps

Download PDFLocation Map
(2.2 MB)

Photos

 


A scarcity of new discoveries and long lead times ensures exploration successes will be rewarded.